# Rejection of marked products

We develop product removal units driven by inspection results. The design links each failed result to the corresponding item and the rejection mechanism.

## How the equipment is configured

Products continue moving between inspection and rejection, so item tracking must be maintained. Weight, stability and permitted contact determine the removal method. Removal confirmation and behavior when the reject bin is full are separate requirements.


## Inputs for the technical specification


- Rejection reasons and trigger signal
- Distance from inspection to removal
- Weight and permitted product contact
- Removal confirmation and bin capacity


## Configuration and quotation

Send a product sample or drawing, the required operation and a site layout. We agree the equipment configuration, operating conditions and acceptance criteria before preparing a quotation. Price and lead time are confirmed for the specific project.

[Discuss your application](https://rmgrup.ru/en/oborudovanie-dlya-markirovki/otbrakovka/#contact)
